The goal of this blog is to become a dynamical way of providing fast and updated useful information, to the user of the instrument OSIRIS at GTC, complementing the information provided by GRANTECAN S.A.
It contains information about the manuals, instrument calibration, pipelines for download, tutorials, contributions, announcements, etc. Also, some historical information about the integration, and commissioning of the different observing modes is provided as well.
This Blog is maintained by the OSIRIS Scientific Team.

Wednesday, April 05, 2006

Montaje del Colimador 3 de Abril de 2006








Durante el día 3 de Abril se están realizando tareas de ensamblaje en el IAC de distintos elementos de Osiris (WSS, estructura y colimador) en Sala Limpia con la asistencia de técnicos de SESO (Francia)

Operaciones de montaje 3 de Abril de 2006





Durante el día 3 de Abril se están realizando tareas de ensamblaje de distintos elementos de Osiris (WSS, estructura y colimador) en Sala Limpia.

Tuesday, April 04, 2006

Los espejos del Osiris: el COLIMADOR



Durante los días 3, 4 y 5 de Abril se están recibiendo en las instalaciones del IAC los dos espejos de Osiris. En las imágenes, técnicos de SESO (France) revisando el ESPEJO COLIMADOR.

Los espejos de Osiris: el FOLDER



Durante los días 3, 4 y 5 de Abril se están recibiendo en las instalaciones del IAC los dos espejos de Osiris. En las imágenes, técnicos de SESO (France) revisando el espejo de doblado de haz, también llamado FOLDER MIRROR.